Photo 1 of 66
$479,500
Beds |
Baths |
Sq. Ft. |
Taxes |
Built |
2 |
2.00 |
1,817 |
$1,221 |
1992 |
On the market:
52 days
|
View full details, 15 photos, school info, and price history
What do you get when 2 contractors renovate a home for themselves and then decide to move? Nothing but top notch upgrades! You are going to want to see this turnkey home. This updated expanded Safford has 2 bedrooms, 2 bathrooms and an office/storage space adding 148.5 sq ft to the home. This kitchen and the bathrooms will make you feel as if you are in a modern new build home. Ceiling to floor tile showers, a nice big island with lots of drawers, updated fixtures throughout the home, ceiling fans, led lighting, custom closets, entertainment wall with electric fireplace and tv niche with wood and stone finishes. Look all around the home for high quality updates, such as the a pot filler, medicine cabinets in the master suite, tile shelves built into the showers. Exterior/Structural/Mechanical updates: 2022-2023
-New energy shield windows in some spaces (Primary bedroom and bathroom, Bedroom 2 and bathroom 2, Living room, and sliding glass door) 2023
- New front door and lock 2023
-Exterior painted by Desert Mesa Painting (using Dunn Edwards paint) 2023
-Expanded driveway 2023
-Rear patio expanded and added walkway 2023
-New exterior lights 2023
-Ficus tree planted 2023
-Trane AC and Furnace 2022
Family Room - 2023
-Flooring
-Door trim
-Baseboards
-Paint
-Added entertainment wall with electric fireplace, TV mount, stone and French white oak trim
-Ceiling fan
Primary Bedroom - Early 2023
-Flooring
-Paint
-Baseboards
-Doorway trim
-Accent wall (French white oak)
-Ceiling fan
Primary Bathroom - Early 2023
-Flooring
-Walk-in tile shower (Schluter Kerdi- Waterproofing/moisture barrier) with 3 built in shelves
-Tile
-Toilet
-Paint
-Trim
-Lights
-Mirrored medicine cabinets (main mirror)
-Vanity
-Faucets
Bathroom 2- 2022
-Tub
-Faucet
-Tile
-Vanity
-Faucet
-Flooring
-Light
-Trim
-Paint
-Toilet
Bedroom 2- 2022
-Flooring
-Baseboards
-Doorway trim
-Paint
-Ceiling fan
Kitchen- 2023
-Floors
-Paint
-Cabinets (soft close hinges, built with extra steps to ensure durability)
-Counter tops: Quarts (all but island) Granite (Island)
-Gas stove
-Sink and faucet
-Island added
-Wall removed to expand layout
-Under Cabinet Lights
-Lights
-Slider added to access backyard
-Backsplash
-Cabinet Handles
-Pot filler
Office / Storage 2024/2025
Converted from AZ room
Added Storage Closet
Added doorway
New floor
New trim
Paint
Laundry room Feb 2024
Floor Paint
Trim
Expanded and moved doorway to garage
Prior owner updates:
-Fence
-AZ room enclosed
-Roof Underlayment - Approximately 2017 (per a neighbor)
-Dishwasher-about 5 yrs old
Listing courtesy of Melissa Twitchell, eXp Realty